The Existing library at the Main Campus will be temporarily Shifted to the Existing Auditorium at the Main Campus, IBA.


 Built-up Area : 5500 sft

Built-up Area : 75,803 sft.
Construction Period : 2008
Architecture Interior Design & Planning : View